Phase 1: Pre-Planning & Site Survey
Gather essential project information and conduct site assessment
Project Information
Ground Conditions (M5)
Site Survey Checklist
Ground Conditions
Proximity Hazards & Environment
Access, Egress & Setup
Public Safety & Control Zones
Personnel & Communication
Documentation & Emergency
Phase 2: Load Calculations
Calculate load weights, COG, and lifting accessories
🧮 Advanced Load Weight Calculator (M9)
Calculate weight for different load shapes and materials
📐 Centre of Gravity (COG) Determination (M10)
📏 Lift Parameters
🔗 Lifting Accessories & Sling Tension Calculator
Additional Lifting Equipment
Phase 3: Crane Selection & Ground Bearing
Select appropriate crane and verify ground bearing pressure
🏗️ Crane Selection & Specifications
⚙️ Boom Configuration
⚖️ Ground Bearing Pressure (GBP) Calculator
Verify ground can support crane + load without settlement
🛡️ Outrigger Pad Specification
✅ Capacity Verification
Phase 4: Lifting Plan Diagram
Create scale drawing with crane position and hazards
🎨 Diagram Requirements (RTITB M7)
📐 Diagram Dimensions
🎨 Interactive Diagram Builder
Create a professional site diagram using the drawing tools below. Select a template to start, or use tools to draw from scratch.
Phase 5: Risk Assessment
Identify hazards, assess initial risk, and define controls to achieve safe residual risk (M24-M26)
📚 Hazard Database
Select common hazards to auto-fill control measures.
📊 Risk Matrix Reference
⚠️ Hazard Control Register
| Hazard Description | Initial (L × S) |
Control Measures | Residual (L × S) |
Result |
|---|
Phase 6: Sequence of Operations (Method Statement)
Define step-by-step method statement (M27) and team responsibilities
👥 Lifting Team Assignments
📋 Method Statement Builder
Phase 7: Contingency Plans & Emergency Response
Emergency procedures, abort criteria, and rescue plans
🚨 Abort Criteria
Operations must STOP immediately if any of the following occur:
📞 Emergency Contacts
🆘 Rescue Plan
🔄 Contingency Scenarios
Define actions for common emergency situations:
Equipment Failure
Weather Deterioration
Ground Settlement
Personnel Injury
Phase 8: Final Checklist & Export
37-point RTITB LTG1707 compliance verification